How Long Does Solar Installation Take? Paperwork vs. Roof Time, Side by Side
Ask how long solar installation takes and you’ll hear two very different answers: one to three days, and two to four months. Both are true, because the panels are the shortest part of the job.
If you’re paying around 38¢ per kWh to Con Edison and watching rates climb about 8% a year, every month of waiting is a month of full-price bills. So it helps to know where the time actually goes. Here is how the timeline breaks down for a typical Westchester or NYC home, and which parts you can speed up.
The part everyone pictures: roof time
A standard residential system goes up in one to three days. A crew sets the racking, mounts the panels, runs the wiring to your inverter and main panel, and cleans up. Larger roofs, complicated rooflines or a needed electrical panel upgrade can stretch that to a week. This is the visible, satisfying part, and it is also the smallest slice of the calendar.
The part nobody pictures: everything before and after
Before a single panel goes up, your installer designs the system around your actual Con Edison usage, files for the NY-Sun rebate, and submits permit drawings to your town or borough. Once the roof work is done, the building department inspects, and Con Edison reviews the interconnection and grants permission to operate. Your system can be fully installed and still switched off until that approval arrives.
| Stage | Typical time | Who controls it |
|---|---|---|
| Site survey and system design | 1–2 weeks | Installer |
| Permits and NY-Sun application | 2–6 weeks | Your town or borough |
| Physical installation | 1–3 days | Installer |
| Inspection | 1–3 weeks | Building department |
| Con Edison approval to operate | 2–6 weeks | Con Edison |
These ranges move with the season and the municipality, so treat them as planning numbers, not promises. Any installer who guarantees an exact date before permits are filed is guessing.
What actually speeds things up
You can’t change how fast Con Edison reviews an application, but you can avoid the delays that are self-inflicted. Have your recent bills ready so the design starts right away. Say so early if your electrical panel is old, since an upgrade adds a step. Choose an installer who files in your town every week, because they know which departments want which drawings. And if your roof needs repair, deal with it first. A roofer and a solar crew on the same contract, as we offer, means no gap between the two jobs.
Starting in the cooler months is fine. Production is lower in winter (about 5 peak sun hours versus 9 in summer), but net metering credits at the full retail rate mean the sunny months make up the difference over the year.
Is the wait worth it?
For most homeowners, yes. A typical $300 Con Edison bill drops to roughly $150–$180 a month, plus a basic service fee of about $20 for grid connection. With $0 down financing, the monthly payment is usually below what you pay today from the first month it’s switched on. Two to four months of planning buys 25 years of that gap.
State Solar · Free Analysis
Want a realistic timeline for your home?
We’ll review your Con Edison bill and your town’s permitting, and tell you what to expect from signature to switch-on. No commitment, no pressure.